Cost Of Gwb Toll 2024 Toll. The toll hikes apply only at bridges and tunnels between the big apple and garden state — the lincoln and holland tunnels, the george washington, bayonne, and goethals. Starting friday, november 3, 2023, and lasting for approximately two years, construction commenced on the lemoine avenue bridge requiring closures of traffic lanes, walkways, and.
A confirmed toll increase will be implemented on january 5, 2025. The toll hikes apply only at bridges and tunnels between the big apple and garden state — the lincoln and holland tunnels, the george washington, bayonne, and goethals.